After their trip to the UP Marcy and Mark stopped back here and spent a final afternoon helping out before leaving for California.
Marcy started some painting over the tub area and Mark helped me hang some crown molding.
It was a great Blessing to have their help and company!
My next task was to finish the open wall back in the kitchen where the new drain was put in many weeks ago!
Still some sanding then painting but it's good to have this wall back in shape.
Then I finished off the trim around the window, the crown molding and installed the beam and corbel columns that will separate the tub area
Now more sanding and caulking then priming and top coating. Tile then Fixture installations and then baseboard installations.