Tile is in and set-the grout comes next then fixture installation.
All the beadbaord is up and the painting is done. Spencer and O'Neill came over on 10/27 and 10/28 and helped me tile the floor.
Spencer and I layed out the Ditra.
Then spread the mortar and layed down the Ditra to the subfloor.
The Ditra and mortar set overnight. Sunday afternoon O'Neill, Spencer and I layed down the tile.
We started with the 6" squares that define the tub area.
Then we worked backward toward the window wall.
Then we worked outwards towards the door.